Changiweg 5, Rozenburg
Changiweg 5
Rozenburg (NH.)
Neem contact met ons op voor de prijs
- Beschikbaar5.545 m²
- Object omschrijving
- Parkeerdetails
- Opleveringsniveau
- Energielabel
- Locatie en bereikbaarheid
- Floor plan
- Brochures
- Makelaars
- Neem contact op
Object omschrijving
Ruimtes beschikbaar
Parkeerdetails
The property offers 40 on-site parking spaces.
Opleveringsniveau
General:
* BREEAM Very Good ***
* Steel building frame
* Insulation value of RC= 6.0 sq.m. K/W for the roof and RC= 4.5 sq.m. K/W for the facades
* Fire alarm and evacuation alarm, fire hoses, emergency lighting as per regulations.
Warehouse:
* 7 loading docks with electrically operated steel doors
* 1 electrically operated overhead door on ground level (4.0 x 4.5 m1)
* Floor load capacity of the warehouse: 5,000 kg/sq.m.
* Floor load capacity of the expedition: 2,500 kg/sq.m.
* Floor load capacity of the mezzanine: 800 kg/sq.m.;
* Racking point load approx. 9,000 kg
* Free height approximately 12.2 m1 at warehouse
* Floor flatness warehouse: Din 18202 Zeile 4
* Floor flatness expedition: Din 18202 Zeile 4
* Storage sprinklers, roof-net certified automatic sprinkler system (ESFR FM)
* Free span of 18.0 m1 (column structure)
* LED lighting;
* Sufficient number of 230V and 380V power connections
* Direct-fired heaters.
Offices:
* Two levels
* Central heating system
* Mechanical ventilation, fitted with air conditioned ceiling cassettes
* Suspended ceilings fitted with monitor friendly integrated LED lighting
* Cable ducts for data.
Site/exterior:
* Battery charging area
* 2.0 m1 high security fencing (partly) and water boundaries
* Truck entrance and exit equipped with electrically operated barrier and intercom
* Paving with heavy-duty concrete vowel
* Excellent outdoor site lighting over loading pits
* Fibre optic network available at Schiphol Logistics Park.
PARK MANAGEMENT
The park management association offers the following services:
* Maintenance of public area
* Maintenance of hillsides and watercourses
* Collective security
* Signage and wayfinding
* Sustainability
* Maintenance of fire extinguishing facility.
Energielabel
EPC Vrijgesteld
Locatie en bereikbaarheid
Car
This building is located just a few minutes’ drive away from the highway A4 (Amsterdam – The Hague) and is furthermore directly situated next to the provincial highway N201. The cargo platform of Amsterdam Schiphol Airport is accessible within less than five minutes.
Public Transport
The nearest bus stop is a 15-minute walk from the property. From there, you can take bus lines 180 and 181, which will bring you to Schiphol Airport station within 10 minutes.
Makelaar

Martijn Steenvoorden
Consultant - Leasing Advisory | Industrial & Logistics
Makelaar details













