{{getDisplayDistance(item.locationRange) }}
  • {{ option.name }}
photo

T-Port Campus Almelo

Columbus 11-14
7609RL Bornerbroek

T-Port Campus Almelo

The site is situated on XL Businesspark Twente in Almelo and is a unique AAA - view location on the A35 highway with multimodal transport flows. The campus has a barge terminal on site. Furthermore, it is worth mentioning that Twente Airport, situated at 20 km, is available for business flights.The campus consists of a modern and multi-functional distribution center with a total of 180.000 Sq.m warehouse surface, which can be divided in separate and linkable units of approx. 10.000 to 15.000 Sq.m. To guarantee an efficient handling of all the logistic processes, the warehouse is built with a maximum amount of loading docks per unit. Spread out over the campus there’s plenty of employee parking, completely separate from the lorry traffic. And last but not least: in the region there is still highly motivated labor available. In this area there is a close collaboration between  education institutions, the government and the business community.

 

Warehouse

- Clear height: 12,2 m

- Span & column grid suitable for both small and wide aisles

- 1 dock door per 1.000 m2

- dock equipped with dockleveller (60kN dynamic load), shelter and bumper bars

- 1 ground level access door (4m x 4,7m) per unit

- Floor load: 50kN/m2

- Maximum point load pallet racking: 80kN/foot

- Flatness tolerance: according DIN18202, Table 3, Zeile 4 (5mm/2m)

- Insulated concrete plinth with a height of 2,5m

- Certified automatic sprinkler installation (ESFR roof sprinklers)

- Fire hose and hydrants conform to local regulations and building code

- Fire alarm and evacuation system conform the rules and code

- Heating (12°) and ventilation system

- Lighting: energy efficient LED

 

 

Warehouse

Mezzanine

Office

Unit 1

15.184 sq.m.

Built to suit

Built to suit

Unit 2

11.406 sq.m.

Built to suit

Built to suit

Unit 3

15.111 sq.m.

Built to suit

Built to suit

Unit 4

15.111 sq.m.

Built to suit

Built to suit

Unit 5

15.111 sq.m.

Built to suit

Built to suit

Unit 6

15.111 sq.m.

Built to suit

Built to suit

Unit 7

10.279 sq.m.

Built to suit

Built to suit

Unit 8

17.850 sq.m.

Built to suit

Built to suit

 

 

Warehouse

Mezzanine

Office

Fase 1a

15.935 sq.m.

Built to suit

Built to suit

Fase 1b

15.313 sq.m.

Built to suit

Built to suit

Fase 2a

15.307 sq.m.

Built to suit

Built to suit

Fase 2b

15.380 sq.m.

Built to suit

Built to suit

 

The site is situated on XL Businesspark Twente in Almelo and is a unique AAA - view location on the A35 highway with multimodal transport flows. The campus has a barge terminal on site. Furthermore, it is worth mentioning that Twente Airport, situated at 20 km, is available for business flights.The campus consists of a modern and multi-functional distribution center with a total of 180.000 Sq.m warehouse surface, which can be divided in separate and linkable units of approx. 10.000 to 15.000 Sq.m. To guarantee an efficient handling of all the logistic processes, the warehouse is built with a maximum amount of loading docks per unit. Spread out over the campus there’s plenty of employee parking, completely separate from the lorry traffic. And last but not least: in the region there is still highly motivated labor available. In this area there is a close collaboration between  education institutions, the government and the business community.

 

Warehouse

- Clear height: 12,2 m

- Span & column grid suitable for both small and wide aisles

- 1 dock door per 1.000 m2

- dock equipped with dockleveller (60kN dynamic load), shelter and bumper bars

- 1 ground level access door (4m x 4,7m) per unit

- Floor load: 50kN/m2

- Maximum point load pallet racking: 80kN/foot

- Flatness tolerance: according DIN18202, Table 3, Zeile 4 (5mm/2m)

- Insulated concrete plinth with a height of 2,5m

- Certified automatic sprinkler installation (ESFR roof sprinklers)

- Fire hose and hydrants conform to local regulations and building code

- Fire alarm and evacuation system conform the rules and code

- Heating (12°) and ventilation system

- Lighting: energy efficient LED

 

 

Warehouse

Mezzanine

Office

Unit 1

15.184 sq.m.

Built to suit

Built to suit

Unit 2

11.406 sq.m.

Built to suit

Built to suit

Unit 3

15.111 sq.m.

Built to suit

Built to suit

Unit 4

15.111 sq.m.

Built to suit

Built to suit

Unit 5

15.111 sq.m.

Built to suit

Built to suit

Unit 6

15.111 sq.m.

Built to suit

Built to suit

Unit 7

10.279 sq.m.

Built to suit

Built to suit

Unit 8

17.850 sq.m.

Built to suit

Built to suit

 

 

Warehouse

Mezzanine

Office

Fase 1a

15.935 sq.m.

Built to suit

Built to suit

Fase 1b

15.313 sq.m.

Built to suit

Built to suit

Fase 2a

15.307 sq.m.

Built to suit

Built to suit

Fase 2b

15.380 sq.m.

Built to suit

Built to suit

 

Contact

{{item.Location.Street}} {{item.Location.HouseNumber}} {{item.Building.BuildingName}}

{{item.Location.Street + " "+ item.Location.HouseNumber}}
{{item.Location.Postcode}} {{item.Location.City}}

{{ 'SEARCH.SEARCH_BAR_LEFT.TYPE_LIST.' + item.Offer.OfferType|translate }}

{{ item.Offer.OfferMetrageNet|formatNumber }} m²

{{ 'SEARCH.SEARCH_RESULT.GRID.RentFrom'|translate }} {{ item.Offer.OfferMetrageLetMinimalFrom|formatNumber }} m²

  • {{ 'SEARCH.SEARCH_RESULT.LIST.BuildingStatus'|translate }}:{{ 'SEARCH.SEARCH_RESULT.SHARED.BuildingStatusList.'+item.Building.BuildingStatus | translate }}
  • {{ 'SEARCH.SEARCH_RESULT.LIST.FloorArea'|translate }}: {{ item.Offer.OfferMetrageNet | formatNumber }} m²
  • {{ 'SEARCH.SEARCH_RESULT.LIST.RentFrom'|translate }}:{{ item.Offer.OfferMetrageLetMinimalFrom|formatNumber }} m²
  • {{ 'SEARCH.SEARCH_RESULT.LIST.ParkingSpaces'|translate }}:{{item.Offer.OfferNumberOfParkingSpaces|formatNumber}}